











This project involved the demolition and replacement of an existing four-storey fire training tower while preserving the original raft slab and building footprint due to the property's archaeological designation. Construction included new concrete foundations and a specialized pre-engineered fire training tower, complete with fire-rated panels, electrical systems, and training equipment.
The project also included upgrades to the existing on-site facility, featuring renovated washrooms, showers, and training areas to better support firefighter training and operations. Together, these improvements provide a modern, functional training environment designed to meet the needs of emergency response personnel.
Site Design by Capture Studio